Jack McDonald Snowshed Rehabilitation


Project Description:
CWP was contracted by Trans-Canada Highway Maintenance to complete rehabilitation work within the Jack Macdonald Snowshed. The scope of work included removal of existing concrete and re-pouring 7 structural columns in 2 phases.
Job Duration: August 2024 – Current
Two Hills Bridge Rehabilitation


Project Description:
CWP is proud to be undertaking a comprehensive bridge rehabilitation project on Hwy 36 over the Vermillion river, Two Hills. This project involves essential concrete repairs on both the substructure and superstructure of the bridge, ensuring its long-term durability and safety. Our team is also constructing new drain troughs to enhance water management, applying waterproofing and sealing techniques to protect the bridge from environmental elements, and installing fresh asphalt pavement for a smooth, resilient surface. These improvements are vital to maintaining the bridge’s functionality and ensuring safe passage for all vehicles. CWP is committed to delivering high-quality, efficient solutions to support the infrastructure needs of the Two Hills community
Job Duration: August 2024 – September 2024
City of Edmonton Scona Road Bridge Rehabilitations


Project Description:
Scona Road and 98th Avenue Bridge Rehabilitations project focused on vital structural repairs and upgrades to key infrastructure in downtown Edmonton. Starting in April 2024, and expected to be completed by August 2024, this project ensures the longevity and safety of these important thoroughfares.
For the Scona Road Bridge, the scope of work included traffic and pedestrian accommodation and staging, structural repairs, HPC concrete deck overlay, barrier replacement, bridgerail repairs, approach paving repairs, and concrete cleaning and sealing. Meanwhile, the 98th Avenue Bridge rehabilitation involved structural repairs to abutments, wingwalls, and prestressed girder ends, installation of a reinforced HPC concrete deck with synthetic fibers, ACP tie-ins, and void grouting.
The project’s key objectives were to rehabilitate deteriorated bridge structures in a busy downtown area, extending their lifespan and revitalizing the infrastructure. Challenges included managing heavy traffic and working within the environmentally sensitive North Saskatchewan River Valley. By using innovative methods like the spin screed or rolling screed for deck paving, the team efficiently worked within the tight area and traffic accommodations.
The collaborative efforts of CWP Constructors, Morrison Hershfield, and the City of Edmonton ensured the project’s success, with the Scona Bridge expected to open by middle of July, and the 98th Avenue Bridge by Mid August, both ahead of schedule. Community engagement through town halls and public hearings kept residents informed and involved, ensuring the rehabilitated bridges would serve the community for many years to come.
Job Duration: April 2024 – August 2024
Weyerhaeuser Haul Road Bridge HWY 40


Project Description:
CWP has been engaged to be a key player in the Highway 40 twinning project, south of Grande Prairie, Alberta. Our team is hard at work constructing components including cast-in-place transition walls, connecting existing infrastructure with new MSE panel walls. CWP will also be constructing the new steel girder bridge spanning the Weyerhaeuser haul road, the bridge consists of Cast-in-place integral abutments, steel girders, cast concrete deck, guardrail, approach slabs, waterproofing approach rail, drain trough systems and an asphalt wearing surface.
Job Duration: April 2024 – Current
167 Street Bridge Replacement


Project Description:
Constructed to improve the connectivity and safety for both public and agricultural travel, the 167 Street over Whitemud Creek Bridge Replacement project addressed the need to replace an aging and unsafe structure. The comprehensive scope of work included the demolition of the existing bridge and the installation of a new 3-span bridge structure, comprising piles, piers, abutments, girders, approach slabs, and bridgerail. Additionally, the project involved the grading of the streambed and slopes of Whitemud Creek, the installation of heavy rock rip rap, landscaping, and environmental remediation.
One of the notable challenges was performing the complete stream isolation and in-stream work in Whitemud Creek, an environmentally sensitive area. The project also required significant stakeholder involvement, working closely with landowners to widen the bridge into their properties. By utilizing a proprietary formwork system on the pier structure, CWP successfully completed the work within the restricted access period without impacting the creek.
This project, valued at approximately $2.5 million, not only improved road safety but also enhanced access for agricultural equipment. The newly constructed bridge can handle 1/100 year flood levels and provides a safer, wider roadway for the community.
Job Duration: February 2024 – July 2024
Albert Canyon West Bridge and East Retaining Wall Rehabilitation


Project Description:
The Albert Canyon project for BCMOTI is CWP’s largest project to date ($12.3M) and is located on the Trans-Canada Highway, approximately 34km East of Revelstoke, BC. This project consists of installing a detour bridge over the Illecillewaet River, detour road, bridge rehabilitation and steel bin wall rehabilitation. The detour bridge supplied by Acrow was assembled onsite and cantilever launched over the river. The detour bridge and road will be removed at the end of the project once the bridge rehabilitation is complete. The bridge rehabilitation scope of work includes the reconstruction of the concrete overhangs, new parapets, bicycle railing, bridge deck repairs, bridge deck concrete overlay, deck joints, approach paving, bearing replacements, and substructure steel re-coating. The bin wall rehabilitation scope of work includes rock anchoring, shotcrete and a cast-in-place concrete retaining wall.
Job Duration: September 2023 – Current
Parks Canada Snowshed Rehabilitation


Project Description:
Park’s Canada employed CWP to rehabilitate 53 concrete columns within 3 snowsheds along the Trans-Canada Highway in Glacier National Park. The columns were installed with shoring posts prior to removal of the existing concrete and re-pouring the columns. The new columns were also wrapped with a GFRP coating and a waterproofing layer. This project also included rehabilitation of pre-cast wall panels, repairs to the existing snow fence and installation of new traffic barriers.
Job Duration: June 2023 – October 2023
Fort McMurray High Load Bridge Rehabilitation


Project Description:
Located on Hwy 63 in Fort McMurray, this project involved replacing an exterior girder damaged by a high load. The scope of work also included replacing all three deck joints and casting a new sidewalk atop the girders. The damaged girder was successfully demolished in a single night. A new box girder was then fabricated and erected using two cranes. Additionally, a complete hoarding was erected on the bridge deck to cast the sidewalk and reinstall the bridge rails.
Job Duration: August 2023 – December 2023
Manning Bridge Rehabilitation


Project Description:
Constructed in 1955, Manning Bridge has played a vital role in connecting communities north of the Notikewin River on Highway 35 with essential goods and services. This bridge has well exceeded it’s service life and as such was in much need for repair. CWP completed the bridge rehabilitation in a span of 6 months consisting of milling, concrete demolition, full depth delamination repairs, abutment backwall repairs, deck joint seal replacement, dry finishing and sealing, chip sealing, and approach paving. Due to the multitude of repairs, this project required construction of a temporary suspended work platform below the bridge deck while still maintaining a single lane of traffic above. This project also earned CWP the 2024 Alberta Transportation and Economic Corridors Minister’s Partnering Award of Excellence for exceptional teamwork between all parties involved.
Job Duration: April 2023 – September 2023
Taylor Drive Bridge/Red Deer River Bridge Rehabilitation


Project Description:
This is CWP’s first project with The City of Red Deer. The Taylor Drive Northbound bridge consists of five spans over the Red Deer River. The scope of work for this bridge rehabilitation includes construction of a temporary median cross-over detour, traffic accommodation, road surface removal, bridge deck concrete repairs, barrier concrete repairs, approach guardrail modifications, new bridge deck waterproofing and asphalt pavement system, substructure dry finishing and sealing, barrier dry finishing and sealing, deck drain modifications, pier stream gauge installation, the installation of a specialty hydrocarbon sensor assembly including piling and re-construction of the median.
Job Duration: May 2023 – August 2023
Grande Prairie 99th Ave Bridge Repairs


Project Description:
This project involved the rehabilitation of two bridges located in downtown Grande Prairie. The scope of work included replacements of the deck overlay, expansion joints, approach rail and chip sealant coating on the 99th Avenue bridge, as well as delamination repairs on both bridges.
Job Duration: May 2022 – July 2022
Summit Creek Bridge Rehabilitation


Project Description:
This is CWP’s second bridge rehabilitation project with BCMOTI. The Summit Creek bridge is located on Highway 3, approximately 10 km West of Creston, BC. The bridge consists of a steel truss spanning between two concrete piers on either side of the river, steel girders, floor beams and diaphragms with a concrete bridge deck. The scope of work for this bridge rehabilitation included traffic accommodation, road surface removal, bridge deck concrete repairs, demolition of bridge deck overhangs, reconstruction of new overhangs complete with bridge parapets and bicycle parapet railings, installation of deck drains, deck joints replacement, steel truss modifications and coating, concrete deck overlay, roadway drainage improvements, approach asphalt paving and installation of concrete roadside barriers.
Job Duration: April 2022 – November 2022
TransAlta Kananaskis Bridge


Project Description:
This is CWP’s first compete design build bridge project, CWP has teamed up with Geometrix, Basin Environmental, and Acrow Bridge along with other key sub trades to complete the new bridge build. The Project consists of a new single span, single lane bridge to accommodate larger loads and replace the 70+ year old bailey bridge used for access to the owners Hydro-Electric Generating Stations. The project location is Seebe, Alberta about 40 minutes west of Calgary where the Bow River and Kananaskis rivers meet, another familiar geographic feature to the area is mount Yamnuska a few kilometers from the site. The scope of work for this project includes stripping, piling, roadworks, cast in place sub-structure, pre-cast wing walls, supply and installation of a modular steel bridge structure including a timber deck, paving, bridgerail and approach guardrail.
Job Duration: September 2022 – May 2023
Range Road 210 Bridge Replacement


Project Description:
This project is located along Range Road 210, near Josephburg , AB. The scope of work included removal of the existing bride structure, driving new steel piles, instream works and construction of a new standard precast bridge.
Job Duration: July 2022 – October 2022
Horsehills Bridge Replacement


Project Description:
This project is located along Horsehills Rd over Horshills Creek East of 18 St in Edmonton, AB. Scope of work includes: Stream Isolation, Demolition and disposal of existing bridge, Installation of bank rock armoring, Driven pile installation, Installation of standard bridge components including cast-in-place abutment and approach slabs, Earthworks involving 600m of road improvements, Bridgerail/guardrail installations, Signage installations.
Job Duration:
Oldman River Dam Spillway Concrete Repairs


Project Description:
This project consisted of concrete repairs on the Oldman River Dam spillway located near Pincher Creek, Alberta. The scope of work for this project included concrete delamination repairs on the spillway slab and walls as well as crack and spall repairs on the spillway slab.
Total Job Value: $400K
Job Duration: September 2021 – October 2021
Highwood River/Centre Street Bridge Rehabilitation


Project Description:
This project is a bridge rehabilitation and improvement project in the Town of High River on Centre Street (Highway 2A) over the Highwood River. The scope of this project includes environmental protection, waterway accessibility, handrail modifications and painting, metallize existing bearings, refurbish abutment expansion joint and add compression seal, girder end painting, and new microsurfacing wearing course.
Total Job Value: $600K
Job Duration: July 2021 – October 2021
Ada Boulevard over Wayne Gretzky Drive and 104 Capilano Drive Pedestrian Overpass


Project Description:
The project consists of rehabilitation of Ada Boulevard bridge located within Edmonton’s River Valley. Scope of work includes demolition of existing elements from wingwalls, deck joints, bridge rails, South curb, and delamination repairs on abutments, backwalls and wingwalls. Project also includes pouring concrete for deck overlay, sidewalk and two concrete barriers across the span of the bridge. New bridge rails guard rails and light poles were installed. All Steel elements of the bridge were coated with new painting which required complete hoarding and containment.
Total Job Value: $5.2M
Job Duration: April 2021 – September 2021
Crowfoot Creek HWY 1 Bridge Rehabilitation


Project Description:
This project was located on Highway 1 Eastbound over Crowfoot Creek, 8km East of Cluny, Alberta. The scope of work for this project consisted of traffic accommodations, asphalt removals, concrete repairs on the abutments, deck and curbs, guardrail upgrades and new high tension cable barriers, new deck waterproofing and asphalt system, deck joint modifications, refinishing of bearings and new drain troughs including rip rap.
Total Job Value: $900K
Job Duration: April 2021 – June 2021
High Load Damage Repairs Near Millet


Project Description:
This project is located on the Highway 616 overpass on Highway 2. The scope of work includes temporary structural support, removal and disposal of existing bridge components, bulkhead beam and girder strut installation, pre-stressing strand splicing and tensioning, partial girder leg replacement, partial deck replacement, partial curb replacement, partial approach slab replacement, partial approach asphalt replacement, and concrete cleaning and sealing.
Total Job Value: $450K
Job Duration: February 2021 – June 2021
Foothills County Bridge Replacement


Project Description:
This Project consists of removal of the old bridge structure, instream work, construction of the new standard precast bridge, road works, guard rail and asphalt. CWP started this project in Fall of 2020 and completed the paving in Spring 2021.
Total Job Value: $0.8M
Job Duration: October 2020 – March 2021
Little Bow River Bridge Rehabilitation


Project Description:
This Project consists of two bridges on Highway 2 over the Little Bow River 5km south east of High River. The scope of work for this project included concrete and asphalt cold milling, new high density concrete overlay, concrete repairs on the deck, curbs, abutments, backwalls, curtain walls, pier caps, and columns, expansion joint sealing gland replacement, approach guardrail replacement, new high tension cable barrier, bridge rail upgrade, concrete cleaning and sealing, void filling below the south abutment, approach transition paving, and refinishing of bearings
Total Job Value: $1.7M
Job Duration: April 2020 – October 2020
Waterton River Bridge Rehabilitation


Project Description:
This project is located along Highway 5 in Waterton Lakes National Park over the Waterton River. The scope of work for this project includes asphalt milling, demolition of bridge deck overhangs, abutment and pier partial depth repairs, reconstruction of new overhangs complete with bridge parapets and bicycle parapet railings, installation of deck drains, concrete deck overlay, new asphalt plug joints, roadway improvements, approach asphalt paving and installation of concrete roadside barriers.
Total Job Value: $2.5M
Job Duration: April 2020 – September 2020
Medicine River Bridge Rehabilitation


Project Description:
This project is located along Highway 12 over the Medicine River. The scope of work includes piling, rebuilding the abutments (Backwall, Grade beam, Wingwalls, roof slab, approach Slab waterproofing/drainage layer), Partial Depth repairs on the Deck and Abutment face, Waterproofing and ACP paving on deck, Head slope Improvements, transition paving, Bridge Rail Upgrade, and new Approach Rails.
Total Job Value: $1.8M
Job Duration: April 2020 – September 2021
Paulson Bridge Rehabilitation


Project Description:
CWP Constructors is pleased to have been award our first contract with the British Columbia Ministry of Transportation and Infrastructure. The Paulson Bridge is located on Highway 3, approximately 50 km West of Castlegar and 25 km East of Christina Lake. The scope of work for this project includes jacking the bridge superstructure, bearings replacement, demolition of bridge deck overhangs, reconstruction of new overhangs complete with bridge parapets and bicycle parapet railings, installation of deck drains, deck joints replacement, concrete deck overlay, wing wall modifications, roadway drainage improvements, approach asphalt paving and installation of concrete roadside barriers.
Total Job Value: $5.5M
Job Duration: April 2019 – November 2019
Lake Louise Campground Bridge Rehabilitations


Project Description:
Consists of two bridges located in the Lake Louise Campground over the Bow river. The work consist of surface removal, partial depth concrete repairs on the deck curbs and underside of the bridge, deck waterproofing, paving, cleaning and sealing of curbs, abutment and piers, pressure injection of cracks in the underside of the girders.
Total Job Value: $0.5M
Job Duration: July 2019 – August 2020
Southern Alberta Bridge Rehabilitations


Project Description:
Consists of 3 contracts for the rehabilitation of four bridge structures. Two structures near Granum AB, one near Carmangay AB and one near Taber AB. The work included surface removal, partial depth concrete repairs, waterproofing, paving, cleaning and sealing of curbs.
Total Job Value: $1.7M
Job Duration: May 2019 – September 2019
Lloydminster Spillway Structure


Project Description:
This project consisted of the construction of a new cast-in-place concrete spillway structure as part of the East Drainage Channel Rehabilitation in Lloydminster, SK.
Job Duration: March 2019 – April 2019
Parks Canada 6 Bridge Rehabilitation


Project Description:
6 Bridge rehabilitation project (two in Field, BC and four in Lake Louise, AB) the contract includes partial depth repair, steel girder coating, removal and reinstallation of deck joints, application of deck wearing surface, drainage repairs, conduit repairs, milling and paving of asphalt wear surfaces, concrete sealing and guardrail installation.
Total Job Value: $2M
Job Duration: October 2018 – August 2020
Southwest Calgary Ring Road – Bridge 22 Project


Project Description:
This project is bridge 22 on the Southwest Calgary Ring Road. The bridge has four lanes and spans 258 meters over Fish Creek including four Y-shaped piers with hammerhead pier caps. CWP’s scope of work for this project consisted of the substructure construction which required 2,500 m3 of concrete. The project involved the installation of associated wood and steel formwork, reinforcing steel, and concrete placement for both abutments and all piers. Working together with the client and accommodating their work in and around the site was key to the success of this project.
Job Duration: September 2017 – November 2018
Ottertail Bridge Rehabilitation (Yoho National Park)


Project Description:
CWP Constructors is pleased to announce our latest project with Parks Canada, and our first project in British Columbia. Ottertail bridge is a concrete girder three-span, two lane bridge located along the Trans-Canada Highway in Yoho National Park. The scope of work for this project included concrete cold milling, partial depth repairs on the bridge deck and substructure, and construction of cast-in-place concrete barriers.
Total Job Value: $2.1M
Job Duration: July 2017 – September 2018
Johnston, Baker, Corral Creek Bridge Rehabilitations (Banff National Park)


Project Description:
This project is located along the Bow Valley Parkway in Banff National Park. Johnston Creek bridge is a concrete box girder, while Baker Creek and Corral Creek Bridges are steel girder bridges. Scope of work for all three bridges includes concrete cold milling, demo and installation of deck overhang, approach slabs and deck joints.
Total Job Value: $1.8M
Job Duration: February 2018 – September 2018
Athabasca River Bridge (East) Bridge Rehabilitation (Jasper National Park)
Project Description:
This two-span, two-lane bridge replacement took place along Highway 16 in Jasper National Park over the Athabasca River. The scope of work included the removal and replacement of concrete box girders and bearing pads. It also included modifications to the abutments and piers, removal and replacement of approach slabs, construction of a new reinforced concrete deck, cast-in-place concrete barriers, installation of bridge rail and approach asphalt. This project was completed in two stages utilizing single-lane alternating traffic.
CWP completed the Athabasca River Bridge (West) in 2016.
Total Job Value: $2.4M
Job Duration: June 2017 – November 2017
KM 24.4 Animal Underpass Bridge Rehabilitation (Banff National Park)
Project Description:
This project is located along the Trans-Canada Highway in Banff National Park and involved the installation of a temporary detour bridge and then the rehabilitation of two two-lane bridges over an animal crossover. The scope of work includes a full detour of Highway 1, concrete cold milling, demo and installation of cast-in-place concrete barriers, deck overhang, approach slabs, and deck joints. The work also includes partial depth repairs to the deck, concrete overlay, modifications to the abutments and piers, installation of bridge rail, approach asphalt, and bearing pad replacement. After the bridge rehabilitations are complete, the detour road and bridge will be removed and the area restored.
Total Job Value: $2.5M
Job Duration: Aug 2016 – July 2017
Snaring and Fiddle River Bridge Rehabilitation (Jasper National Park)
Project Description:
This contract contains two bridge rehabilitations along Highway 16 in Jasper National Park. The Fiddle River Bridge is a concrete girder three-span, two-lane bridge and the Snaring River Bridge is a concrete girder six-span, two-lane bridge. The scopes of work included concrete cold milling, deck overhang demo, and partial depth repairs to the deck as well as deck strengthening using external stirrups. It also included partial depth repairs to the piers, replacement of deck joints, concrete overlay, cast-in-place concrete barriers, installation of bridge rail, approach asphalt, girder jacking and bearing pad replacement.
Total Job Value: $3.1M
Job Duration: July 2016 – July 2017
Athabasca River Bridge (West) Bridge Rehabilitation (Jasper National Park)
Project Description:
This three-span, two-lane bridge rehabilitation took place along Highway 16 in Jasper National Park over the Athabasca River. The scope of work included the removal and replacement of the concrete box girders and bearing pads. It also included modifications to the abutments and piers, removal and replacement of approach slabs, construction of a reinforced deck, cast-in-place concrete barriers, installation of bridge rail and approach asphalt.
Total Job Value: $3.9M
Job Duration: March 2016 – Oct 2016
Linden Bridge Rehabilitation
Total Job Value: $0.8M
Job Duration: April 2016 – June 2016
Bullhorn Wasteway Replacement
Project Description:
This wasteway project for Alberta Transportation is located along the Belly River to St. Mary Reservoir Canal near Standoff, AB. CWP’s scope of work included 1,900 m3 of cast-in place concrete and associated formwork, installation of three radial gates and hoists and installation of a precast concrete vehicle bridge. This included 950 m2 of concrete placed on a 3H:1V slope. In addition CWP performed the concrete works on one downstream road crossing
Total Job Value: $4.6M
Job Duration: August 2015 – April 2016
Whitemud Widening Project
Total Job Value: $0.8M
Job Duration: April 2016 – June 2016
Crowsnest Pass Bridge Rehabilitation
Project Description:
The single span, two-lane bridge rehabilitation took place along Highway 3 over the CPR tracks. Scope of work included traffic accommodation, surface removal and replacement, partial and full depth concrete repairs, removal and replacement of deck joints, underside deck access, void grouting of approach slabs, HPC deck overlay with steel fibers and transition paving.
Total Job Value: $1.1M
Job Duration: April 2015 – July 2015
Seebe Bridge Rehabilitation
Project Description:
This three span, two lane bridge rehabilitation project took place along Highway 1X over the Bow River. Scope of work included traffic accommodation, surface removal and replacement, partial and full depth concrete repairs, removal and replacement of 5 deck joints, pier and underside deck access, removal and replacement of approach slabs, HPC deck overlay with steel fibers and approach paving.
Total Job Value: $3.1M
Job Duration: March 2014 – Oct 2014
Empress Bridge Rehabilitation
Total Job Value: $0.9M
Job Duration: April 2014 – September 2014
Nordegg Culvert Replacement
Total Job Value: $1.2M
Job Duration: July 2014-September 2014
Heinsburg Bridge Rehabilitation
Total Job Value: $1.8M
Job Duration: April 2013 – July 2013
Highway 21 over Highway 16 Bridge Rehabilitation
Total Job Value: $1.4M
Job Duration: August 2012 – October 2012
Zama City Bridge Rehabilitation HWY 35 over Hay River
Total Job Value: $0.6M
Job Duration: June 2012 – September 2012
Mackay River Precast Girder Installation
Total Job Value: $1.2M
Job Duration: April 2012 – June 2012
Castle Mountain Overpass Bridge Rehabilitation
Total Job Value: $0.9M
Job Duration: May 2011 – September 2011