Bell Tower Plaza East Redevelopment

20190723_072029
20190718_170649

Project Description:

This project consisted of the removal and replacement of a plaza deck encompassing Bell Tower. The scope of work included the removal of the existing concrete topping, insulation, and waterproofing membrane followed by the installation of a new waterproofing membrane, insulation, and concrete topping. This project involved working with the public and client to accommodate the pedestrian, vehicle traffic, and public transportation around the work zone.

  Job Duration: April 2019 – June 2019

Southgate Parkade Repairs

Project Description:

This project consisted of the Parking Lot Repair Program on the central structure at the Southgate Mall.  The scope of work included the removal of the existing concrete topping, insulation, and waterproofing membrane followed by structural concrete repairs and the installation of a new waterproofing membrane, insulation, and concrete topping curbs and medians. This project involved working with the public and client to as well as existing tenant spaces below to accommodate the pedestrian, vehicle traffic, and public transportation around the work zone.

  Job Duration: April 2019 – June 2019

Scotia Place Ramp

Scotia 1
Scotia

Project Description:

This project consisted of the removal and replacement of the parking structure entrance ramp at the Scotia Place Building in downtown Edmonton. The scope of work included the removal of the existing concrete topping, insulation, and waterproofing membrane followed by structural concrete repairs and the installation of a new waterproofing membrane, insulation, and concrete topping curbs and medians. This project involved working with the public and client to accommodate the pedestrian, vehicle traffic, and public transportation around the work zone.

  Job Duration: August 2018 – Sept 2019

Bell Tower Plaza Redevelopment

1197-7
1197-2

Project Description:

The project consists of demolition and removal of the existing wear surface and planters. Removal of the old waterproofing system, demolition, and repair of the existing structural slab, replacement of the existing drains, plumbing and associated electrical system.  Installation of a new waterproofing membrane, installation of a new concrete topping and new concrete planters, associated electrical works, new paving stone and associated landscaping works.  All work is was completed above existing parking structure space.  Working with the public and client to accommodate the pedestrian and vehicle traffic through work zones during high profile events at Rodgers place was paramount to the success of the project.  The success of the project has garnered high level BOMA-Best awards for the building operators and owners, and received attention in the architectural community for the beauty of the finished plaza deck.

  Total Job Value: $1.2M

  Job Duration: October 2017 – April 2018

WCB Central and Jarvis Parking Structure

1195-3
1195-2

Project Description:

This project involved Parking Structure repairs at the WCB Central and Jarvis buildings.  The scope of work included repairs to the structural concrete slabs, beams, and columns.  Installation of a new drainage system, application of traffic deck coatings and waterproofing.  The project required extensive planning and coordination with WCB personnel due to the sensitive nature of the work.  CWP performed the project on budget and ahead of schedule with no safety incidents. As a result of our safety performance, quality of workmanship, and the manner our management team delivers projects CWP has secured a spot on WCB’s list of trusted contractors to bid on future projects.

  Total Job Value: $0.2M

  Job Duration: August 2017 – November 2017

Edmonton City Centre East Parkade Suicide Prevention Barriers

Photo 2017-10-27, 4 03 20 PM
edmonton-city-centre-east-parkade_web3

Project Description:

This project was constructed along the top of the 11-story City Centre East Parkade located in downtown Edmonton. It involved the procurement and installation of an architectural weathering steel forest thicket encircling the roof of the parking garage as well as the installation of crisscrossing cables descending the parking structure’s central ramp. The suicide prevention barriers are the first of their kind in the city and CWP Constructors Ltd is proud to have been involved in such an innovative project.

  Job Duration: September 2017 – November 2017

ATB Place South Plaza Deck and Concourse Restoration

1185-3
1185

Project Description:

Plaza re-development over the southern and eastern property limits around the ATB and Telus office towers located at 10030 MacDonald Dr. NW Edmonton, AB.  The project consists of demolition and removal of the existing wear surface and planters. Removal of the old waterproofing system, demolition and repair of the existing structural slab, replacement of the existing drains, plumbing and associated asbestos abatement.  Installation of a new waterproofing membrane, installation of a new concrete topping and new concrete planters, associated electrical works, new railing installation and associated landscaping works.  All work is being completed above existing tenant space.  Working with the public and client to accommodate the pedestrian and vehicle traffic through work zones is paramount to the success of the project.

  Total Job Value: $4.2M

  Job Duration: June 2016 – March 2019

Panel Replacement Project

panel-replacement02
Panel Replacement Project

  Total Job Value: $0.2M

  Job Duration: August 2016 – October 2016

Center 104 Parking Restoration

City Center Parkade 104
City Center Parkade 104

  Total Job Value: $0.3M

  Job Duration: June 2016 – August 2016

Royal Alexandra Hospital South East Parkade Restoration

Royal Alex Parkade
Royal Alex Parkade

  Total Job Value: $0.9M

  Job Duration: April 2015 – April 2016

Edmonton City Center (East) Parkade Restoration

Edmonton City Centre East Parkade Restoration
Edmonton City Centre East Parkade Restoration

Project Description:

Complete rehabilitation of an 11 story parkade in downtown Edmonton.  Scope included the removal of asphalt and waterproofing membrane, performing concrete repairs to the slab, beams and columns, installation of new drains and the replacement of membrane, asphalt and concrete curb.  Traffic management and the general public were the largest risks on this project as the parkade remained operational throughout construction.

  Total Job Value: $5.5M

  Job Duration: March 2014 – October 2016

Other Restoration Projects

  • Strathcona House Condominium Association Northeast Parking Structure Precast Panel Replacement
  • Strathcona House Condominium Association West Underground Parking Structure Repairs
  • Manulife Real Estate Reliant Tire Flood Damage
  • City of Edmonton Misc Projects
  • Canadian Urban Limited Madison Apartments Parking Structure
  • Place-Crete Systems Festival Place Parkade Restoration
  • Ivanhoe  Cambridge Southgate West Central Parking Deck Repairs
  • Humford Management Inc. Compass Place Parkade
  • West Edmonton Mall Phase 1 & 2 Parking Structure
  • West Edmonton Mall Entrance 8 and Lot 9 Repairs
  • Manulife Investment Management Centre 104 West Repairs
  • City of Fort Saskatchewan Pedestrian Bridge Installation
  • Harvest Building Parkade Restoration
  • Edmonton Public Schools Structural Concrete Repairs
  • Creekside Condos Plaza Deck Restoration
  • Melcor Developments Sterling Business Center Plaza Deck Restoration
  • City of Edmonton Police Headquarters Concrete Entrance Restoration
  • Place-Crete Systems McDougal Place Ramp
  • Place-Crete Systems University of Alberta Stadium Parkade
  • Aecon Companies LRT Tunnel Restorations
  • CN Rail HWY 21 Concrete Slope protection Restoration
  • Alberta Transportation Stormwater Concrete structures HWY 21 Twinning
  • CP Rail Concrete apron Restoration
  • Workers Compensation Board Parkade Restoration
  • Alberta Infrastructure St. Albert Courthouse Exterior Concrete Restoration